Garuda Flight Planning

Garuda Flight Planning

July 2018

MonTueWedThuFriSatSun
      1
2345678
9101112131415
16171819202122
23242526272829
3031     

Calendar Calendar

Latest topics

» Rocket Launcher
2010-12-21, 09:47 by Admin

» TGL 11 OCT 2010
2010-10-11, 17:46 by Admin

» TGL 11 OCT 2010
2010-10-11, 17:42 by Admin

» TGL 11 OCT 2010
2010-10-11, 17:38 by Admin

» TGL 11 OCT 2010
2010-10-11, 17:33 by Admin

» TGL 11 OCT 2010
2010-10-11, 17:26 by Admin

» TGL 11 OCT 2010
2010-10-11, 17:22 by Admin

» TGL 11 OCT 2010
2010-10-11, 17:02 by Admin

» TGL 30 SEP 2010
2010-09-30, 11:22 by Admin


    TGL 17 SEP 2010

    Share

    Admin
    Admin

    Posts : 179
    Join date : 2010-07-05

    TGL 17 SEP 2010

    Post  Admin on 2010-09-17, 11:51

    NOTAM INTERNASIONAL
    GARUDA NOTAM & WEATHER SERVICE
    Data Current as of: 9/17/2010, 8:48:23 AM
    RCTP

    RCTP APT 2010090D5CBV01 A1364/10 10 21OCT0000/ PERM
    REF AIP AIRAC AMDT 04/10 DATED 9 SEP 2010 WEF 21 OCT 2010,
    PAGE AD 2-RCTP-77, CODED DESIGNATOR OF STANDARD ARRIVAL
    PROCEDURE /SIGANG ONE ALFA ARRIVAL/ IS REVISED AS /SG1A/,
    /SIGANG ONE BRAVO ARRIVAL/ IS REVISED AS /SG1B/
    THE REST NC.

    RCTP APT 2010090D283V01 A1361/10 10 16SEP0600/10 30OCT1230
    0600-0730 1030-1230
    DUE TO RWY06 FOR DEP AND RWY24 FOR LDG ONLY,
    TRAFFIC FLOW MANAGEMENT FOR AIRCRAFT ARRIVAL RCTP AD
    WILL BE IMPLEMENTED AS FLW:
    1. ALL INBOUND TRAFFIC VIA SALMI, BULAN, AT LEAST 3MIN/25NM
    INTERVAL.
    2. ALL INBOUND TRAFFIC FM VHHH AD VIA ENVAR AT LEAST
    4MIN/30NM INTERVAL.
    3. ALL INBOUND TRAFFIC FM VMMC AD VIA ENVAR AT LEAST 6MIN
    INTERVAL.
    4. RANGE AND PERIOD OF IMPLEMENTATION MAY BE ADJUSTED BY
    TAIPEI ACC.

    RCTP APT 2010090B1C1V01 A1350/10 10 15SEP1600/10 21SEP2200
    1600-2200
    RWY 06/24 CLOSED DUE TO RUBBER DEPOSITS REMOVAL WORK IN PROGRESS.
    RCTP APT 2010090800AV01 A1340/10 10 10SEP1138/10 30OCT2359
    PORTION OF FOLLOWING TWYS CLOSED DUE TO WIP:
    PORTION OF TWY EC BTN TWY SS(EXCLUDED) AND TWY SP(INCLUDED)
    PORTION OF TWY SP BTN TWY S7(INCLUDED)AND TWY S8(INCLUDED)
    PORTION OF TWY S7 BTN RWY 06/24(EXCLUDED)AND TWY SP(INCLUDED)
    PORTION OF TWY S8 BTN RWY 06/24(EXCLUDED)AND TWY SP(INCLUDED)
    RMK:
    1.UNLESS OTHERWISE ASSIGNED BY ATC
    RWY 06 FOR DEP ONLY
    RWY 24 FOR LDG ONLY
    2.U TURN ON RWY PROHIBITED
    3.ACFT IN PARKING BAY 601 AND 602 SHALL PUSH BACK THEN TOWING
    TILL BEHIND PARKING BAY 602 BEFORE START-UP.

    RCTP APT 20100906C47V01 A1330/10 10 21OCT1600/11 30JUN1600
    REF AIP SUP 12/10 DATED 9 SEP 2010
    WITH EFFECT FROM 1600UTC OCT 21, 2010,
    TILL 1600UTC JUN 30, 2011, TAIPEI/TAIWAN TAOYUAN
    INTL AIRPORT CONSTRUCTION WITH TOWER CRANE
    NEAR TERMINAL 1 WILL OCCUR.

    RCTP APT 20100906BE2V01 A1328/10 10 21OCT0001/10 04NOV2359
    TRIGGER NOTAM-PERM AIRAC AIP AMDT 04/10
    THE INSTRUMENT FLIGHT PROCEDURES WILL BE TRANSFERRED TO
    ICAO PANS-OPS BASED PROCEDURES.
    1.MARKER BEACONS OF RCTP ARE DECOMMISSIONED.
    2.RELATED CHARTS OF RCTP ARE UPDATED.

    RCTP APT 2010090484BV01 A1310/10 10 08SEP0600/10 30OCT1230
    0600-0730 1030-1230
    REF NOTAM A1304/10, DUE TO RWY06 FOR DEP AND RWY24 FOR LDG
    ONLY, TRAFFIC FLOW MANAGEMENT FOR AIRCRAFT ARRIVAL RCTP AD
    WILL BE IMPLEMENTED AS FLW:
    1. ALL INBOUND TRAFFIC VIA SALMI, BULAN, AT LEAST 3MIN/25NM
    INTERVAL.
    2. ALL INBOUND TRAFFIC FM VHHH AD VIA ENVAR AT LEAST
    4MIN/30NM INTERVAL.
    3. ALL INBOUND TRAFFIC FM VMMC AD VIA ENVAR AT LEAST 6MIN
    INTERVAL.
    4. RANGE AND PERIOD OF IMPLEMENTATION MAY BE ADJUSTED BY
    TAIPEI ACC.

    RCTP APT 20100903EA6V01 A1305/10 10 08SEP0230/10 30OCT0800
    0230-0300 0730-0800
    REF AIP AD RCTP 2.20.1 2.G
    RWY 05/23 AND RWY 06/24 ROUTINE EXAMINE WORK TEMPORARILY
    SUSPENDED DUE TO CLOSURE OF PORTION OF TWY EC,SP,S7,S8.

    RCTP APT 20100903E8DV01 A1304/10 10 08SEP0000/10 30OCT2359
    PORTION OF FOLLOWING TWYS CLOSED DUE TO WIP:
    PORTION OF TWY EC BTN TWY SS(EXCLUDED) AND TWY SP(INCLUDED)
    PORTION OF TWY SP BTN TWY S7(INCLUDED)AND TWY S8(INCLUDED)
    PORTION OF TWY S7 BTN RWY 06/24(EXCLUDED)AND TWY SP(INCLUDED)
    PORTION OF TWY S8 BTN RWY 06/24(EXCLUDED)AND TWY SP(INCLUDED)
    RMK:
    UNLESS OTHERWISE ASSIGNED BY ATC
    1.RWY 06 FOR DEP ONLY
    2.RWY 24 FOR LDG ONLY
    ACFT IN PARKING BAY 601 AND 602 SHALL PUSH BACK THEN TOWING
    TILL BEHIND PARKING BAY 602 BEFORE START-UP.

    RCTP APT 20100903E59V01 A1303/10 10 06SEP1400/10 07SEP2200
    1400-2200
    PORTION OF TWY WC BTN TWY SP(EXCLUDED)AND TWY NP(EXCLUDED)
    CLOSED DUE TO WORK IN PROGRESS.

    RCTP APT 20100902148V01 A1292/10 10 03SEP0311/10 06OCT0300 EST
    ALL STOP BARS INSTALLED ON RWY 05/23 ASSOCIATED TWY UNSERVICEABLE
    DUE TO INSPECTION WORK IN PROGRESS.

    RCTP APT 20100817F42V01 A1243/10 10 27AUG0816/10 23SEP2359
    NIL AIRAC INFO FOR EFFECTIVE DATE 23 SEP 2010.

    RCTP APT 20100810736V02 A1173/10 10 07SEP0000/10 08SEP0400
    0000-0400
    GUNFIRING WILL TAKE PLACE AS FLW:
    AREA:2510N/12117E 2512N/12117E
    2512N/12121E 2510N/12121E
    RMK: 1) AIRSPACE BLOCKED.
    2) WHEN USING RWY 23 AND 24, GUNFIRING WILL BE
    SUSPENDED BY KNOWN TRAFFIC.
    3) CONTACT TEL:0920-778675.
    SFC
    600FT MSL

    RCTP APT 20100809226V01 A1147/10 10 11AUG0931/ PERM
    HOTSPOTS ARE PUBLISHED IN TAIPEI/TAIWAN TAOYUAN INTL AIRPORT
    AS FLWS:
    HOTSPOT 1: TAXIWAY N11 AND N13 CROSSING RWY 05/23
    HOTSPOT 2: TAXIWAY N9 AND N12 CROSSING RWY 05/23
    HOTSPOT 3: SERVICE ROAD FROM SOUTH FIRE STATION
    CROSSING RWY 06/24.

    RCTP APT 2010070BDC1V01 Z1194/10 WIE /11 31JUL2359
    (20-Cool CLOSED TAXIWAY SC FOR PARKING AND TOWING DATE EXTENDED UNTIL
    31 JULY, 2011.

    RCTP APT 201007048D6V01 A0981/10 10 07JUL0149/11 31JUL2359
    REF AIP SUP 10/10 DATED 06 JUL 2010,
    TAIPEI/TAIWAN TAOYUAN INTL AIRPORT
    TAXIWAY SC CLOSED FOR PARKING AND TOWING
    IS EXTENDED TO 31 JULY 2011, 2359UTC.

    RCTP APT 2010061BB13V01 A0952/10 10 15JUL0000/ PERM
    REF AIP SUP 09/10 DATED 29 JUN 2010
    FROM 15 JULY 2010, 0000UTC,
    THE LOW VISIBILITY PROCEDURES AT
    TAIPEI/TAIWAN TAOYUAN INTERNATIONAL AIRPORT ARE REVISED.

    RCTP APT 2010061BAEDV01 A0951/10 10 15JUL0000/ PERM
    REF AIP SUP 08/10 DATED 28 JUN 2010
    FROM 15 JULY 2010, 0000UTC,
    MODE S SURFACE MOVEMENT SURVEILLANCE SYSTEM OF
    TAIPEI/TAOYUAN INTERNATIONL AIRPORT IS COMMISSIONED.

    RCTP APT 20091218D9BV03 Z1715/08 WIE / UFN
    (22-1/22-2, 22-3/22-4) D-ATIS FREQ 113.7 DELETED.
    Attachments
    RCTP TGL 17 SEP 2010.doc
    You don't have permission to download attachments.
    (73 Kb) Downloaded 0 times

      Current date/time is 2018-07-23, 02:57