Garuda Flight Planning

Garuda Flight Planning

August 2019

MonTueWedThuFriSatSun
   1234
567891011
12131415161718
19202122232425
262728293031 

Calendar Calendar

Latest topics

» Rocket Launcher
TGL 22 SEP 2010 Empty2010-12-21, 09:47 by Admin

» TGL 11 OCT 2010
TGL 22 SEP 2010 Empty2010-10-11, 17:46 by Admin

» TGL 11 OCT 2010
TGL 22 SEP 2010 Empty2010-10-11, 17:42 by Admin

» TGL 11 OCT 2010
TGL 22 SEP 2010 Empty2010-10-11, 17:38 by Admin

» TGL 11 OCT 2010
TGL 22 SEP 2010 Empty2010-10-11, 17:33 by Admin

» TGL 11 OCT 2010
TGL 22 SEP 2010 Empty2010-10-11, 17:26 by Admin

» TGL 11 OCT 2010
TGL 22 SEP 2010 Empty2010-10-11, 17:22 by Admin

» TGL 11 OCT 2010
TGL 22 SEP 2010 Empty2010-10-11, 17:02 by Admin

» TGL 30 SEP 2010
TGL 22 SEP 2010 Empty2010-09-30, 11:22 by Admin


    TGL 22 SEP 2010

    avatar
    Admin
    Admin

    Posts : 179
    Join date : 2010-07-05

    TGL 22 SEP 2010 Empty TGL 22 SEP 2010

    Post  Admin on 2010-09-22, 12:19

    NOTAM INTERNASIONAL
    GARUDA NOTAM & WEATHER SERVICE
    Data Current as of: 9/22/2010, 9:16:32 AM
    RCSS

    RCSS APT 20100911502V01 A1385/10 10 29SEP2200/11 09FEB2200
    REF AIP SUP 06/10 DATED 27 MAY 2010, EFFECT TIME OF PHASE 3
    CONSTRUCTION INFORMATION 1.2. CHANGE TO READ:
    FROM 1009292200 TO 1102092200.

    RCSS APT 2010090F5EFV01 A1367/10 10 18SEP0617/10 14OCT2200
    REF AIP SUP 06/10 DATED 27 MAY 2010, PROLONG TIME OF
    PHASE 2 CONSTRUCTION INFORMAION 1.2.3 TO 1010142200.

    RCSS APT 2010090F5E0V01 A1366/10 10 18SEP0556/10 29SEP2200
    REF AIP SUP 06/10 DATED 27 MAY 2010, PROLONG TIME OF
    PHASE 1 CONSTRUCTION INFORMAION 1.2.3 TO 1009292200.

    RCSS APT 20100902043V01 A1291/10 10 06SEP1600/ PERM
    REF AIP RCSS AD 2.19 RADIO NAVIGATION AND LANDING
    AIDS, ITEM 5, POSITION OF TRANSMITTING ANTENNA
    COORDINATES ARE REVISED AS FOLLOWS:
    10 ILS LOC 250408.6N/1213404.6E
    10 ILS GP 250415.7N/1213235.5E
    10 ILS DME 250415.89N/1213235.77E

    RCSS APT 2010081B60AV01 Z1544/10 WIE /10 12DEC2359
    10-8: REVISED WORK PERIOD FROM 31-AUG-10 TILL 12-DEC-10.

    RCSS APT 20100817CCAV01 A1241/10 10 27AUG0417/10 27NOV0300
    THE COVERAGE BEYOND -6 DEG OF RWY CENTERLINE FOR RWY 10 ILS GP
    329.3MHZ UNSERVICEABLE
    RMK: ILS EQPT CONFORM TO CAT I BY FLTCK.

    RCSS APT 20100817CBAV01 A1240/10 10 27AUG0412/10 27NOV0300
    THE COVERAGE BEYOND -25 DEG OF RWY CENTERLINE FOR RWY 10
    ILS LOC/ITSG/108.9MHZ UNSERVICEABLE
    RMK: ILS EQPT CONFORM TO CAT I BY FLTCK.

    RCSS APT 201008107B5V01 A1177/10 10 31AUG1500/10 12DEC2200
    1500-2200
    REF AIP SUP 07/10 DATED 27 MAY 2010
    REVISE WORK PERIOD FROM AUG 31 2010 TILL DEC 12 2010,
    CONSTRUCTION WILL BE CONDUCTED ON PART OF RUNWAY STRIP
    AND RESA OF RWY 28 AT TAIPEI / SONGSHAN AIRPORT.

    RCSS APT 2010080A59FV01 A1154/10 10 12AUG1109/10 09SEP2200
    REF AIP SUP 06/10 DATED 27 MAY 2010, PROLONG TIME OF PHASE 1
    CONSTRUCTION INFORMAION 1.2.3 TO 1009092200.

    RCSS APT 2010051847DV01 A0749/10 10 27MAY0850/12 25DEC2200
    REF AIP SUP 06/10 DATED 27 MAY 2010
    WITH IMMEDIATE EFFECT UNTIL 25 DEC 2012, 1500 TO 2200 UTC DAILY,
    TAXIWAY E, W, AND SOME PARKING BAYS ARE UNDER CONSTRUCTION PHASE
    BY PHASE AT TAIPEI/SONGSHAN AIRPORT.

    RCSS APT 2010021F357V01 A0205/10 10 26FEB1000/12 30SEP1100
    REF AIP SUP 02/10 DATED 25 FEB 2010, TOWER CRANE IN CIRCLING AREA
    OF TAIPEI/SONGSHAN AIRPORT IS PUBLISHED.
    Attachments
    TGL 22 SEP 2010 AttachmentRCSS TGL 22 SEP 2010.doc
    You don't have permission to download attachments.
    (64 Kb) Downloaded 0 times

      Current date/time is 2019-08-20, 14:49